Strategic bidding can greatly distort market-based redispatch. Here’s how market surveillance can detect it.

Key Takeaways

  • Transitioning from administrative cost compensation to competitive market-based redispatch creates direct incentives for increase-decrease (inc-dec) gaming behind recurring grid bottlenecks.
  • Arbitrage profits do not require monopoly market power; price-taking assets can profit simply by positioning around predictable gaps between day-ahead clearing and real-time interventions.
  • Strategic bidding can inflate redispatch volumes by 300% to 700%, pulling commercial schedules far away from what the physical network can actually support.
  • Ex-post legal penalties under REMIT take years to resolve, making real-time algorithmic surveillance that connects commercial exchange order books directly to physical grid models essential.

Imagine an air traffic system where controllers had to pay cash bounties to any airline willing to divert around an overcrowded airway. Unsurprisingly, carriers would immediately start filing flight plans straight into saturated flight corridors. They would do this not because they expect a clear path, but because getting waved off mid-flight is far more profitable than flying a direct route.

In European power operations, that exact dynamic plays out when assets located behind predictable transmission bottlenecks can turn physical congestion into a lucrative commercial exploit.

In Parts 1 and 2 of this series, we examined why Europe's uniform zonal markets clash with physical line limits, and how regional coordination is making those network bottlenecks far more visible. Historically, system operators resolved those physical limits through administrative cost-based compensation, reimbursing generators for the verified cost of altering their output. Increasingly, European network codes encourage competitive procurement of redispatch and localized flexibility.

That creates a difficult question in areas with persistent network constraints: what happens when a market participant can anticipate that the TSO will need its flexibility?

The answer can be increase-decrease, or inc-dec, gaming.

 

The incentive behind inc-dec gaming

Video file

The mechanics become clear when you compare a strategic position with a baseline commercial schedule.

Let’s say a generator behind a recurring export constraint produces at a marginal cost of €50/MWh, while the day-ahead zonal market clears at €70/MWh. If the plant sells 1 MWh day-ahead and expects to generate it, its basic commercial margin is:

Day-ahead revenue − operating cost = €70 − €50 = €20/MWh

Now assume the generator expects the transmission constraint to require downward redispatch and anticipates a net €40/MWh benefit from reducing its scheduled output. Under this simplified assumption, the expected margin becomes:

Day-ahead revenue + expected redispatch benefit − operating cost

€70 + €40 − €50 = €60/MWh

The expected margin is therefore €40/MWh higher than it would be without the redispatch intervention. That additional value comes from the interaction between the day-ahead position and the expected redispatch settlement.

This is the core inc-dec incentive. If a participant can predict that the TSO will need to reverse part of a position later, the expected value of that intervention can influence the participant’s original day-ahead decision.

The example is deliberately simplified. Actual redispatch settlements differ between markets, and the relevant calculation depends on bid acceptance, balancing exposure, opportunity costs and the precise settlement mechanism. A strategic incentive exists when the expected value of the redispatch intervention is sufficient to offset those risks and costs.

A common assumption is that this type of arbitrage requires a dominant generator with local market power. The research points to a more fundamental problem. As Pär Holmberg explains in a 2024 Energiforsk study, drawing on earlier work by Holmberg and Lazarczyk as well as Hirth and Schlecht:

“Producers do not need market power to make an arbitrage profit.”

A small, price-taking producer can potentially sell power in the day-ahead market at the zonal price and buy back the corresponding volume later at a lower nodal redispatch price. Local market power can increase the opportunity size, but it is not a prerequisite for the basic arbitrage mechanism. (⁠Energiforsk)

Hirth and Schlecht make the same distinction in their research on market-based redispatch, which describes inc-dec gaming as a “consequence of inconsistent power market design (not market power).” (⁠Econstor)

The mechanism also works in the opposite direction. In an import-constrained area, a generator may have an incentive to reduce its day-ahead position if it expects the TSO to need additional local generation later. It can then seek the higher value associated with upward redispatch.

In both cases, the participant’s commercial decision is influenced by an expected intervention from the system operator. The physical constraint creates the opportunity, while the difference between the day-ahead and redispatch settlement creates the financial incentive.

 

How European markets address the risk

European regulators have recognized that pure competitive bidding cannot run unrestricted behind permanent physical bottlenecks. Different countries have erected distinct regulatory firewalls:

United Kingdom: Ofgem enforces the Transmission Constraint License Condition (TCLC, Standard License Condition 20A). The condition bars generators from extracting "excessive benefit" from Balancing Mechanism offers during transmission constraint windows. Ofgem has backed this with aggressive enforcement, including a £24 million fine issued against the South Humber Bank combined-cycle plant for strategic pricing behind network constraints.

Norway: Statnett relies on the Norwegian Regulation on System Responsibility (FOS). When real-time market pricing diverges from economic efficiency, Statnett has the legal authority to disregard submitted offers and settle accepted bids at the prevailing day-ahead price. During severe network stress, the operator can curtail output without compensation.

The Netherlands: On platforms like GOPACS, network operators procure market-based congestion relief only when strict liquidity conditions are met. If a local network pocket lacks at least three independent, non-affiliated market participants, competitive auctions are suspended in favor of regulated tariffs to prevent local extortion.

 

Why market rules need market surveillance

Market rules set the boundaries, but predictable structural bottlenecks can still incentivize strategic bidding. That makes continuous market surveillance an important second line of defense.

Catching that behavior after the fact is painful. Under REMIT, proving prohibited market conduct usually means months or years of retroactive forensic work, sifting through trade logs long after grid tariffs have absorbed the bill. By the time an enforcement penalty lands, the financial damage has already cleared.

Wholesale power markets simply move too fast for manual audits. Thousands of bids, orders, and nominations clear every single hour. Sifting through static spreadsheets cannot tell you whether an unusual bid was an honest commercial hedge or a calculated play on a constrained line.

Algorithmic surveillance brings that inspection closer to the trade itself.

A single odd bid rarely tells the whole story. What matters to a TSO or a market monitor is the broader relationship: how that order connects to an asset's operating history, local network limits, and the eventual redispatch call. If a generator behind a recurring export constraint regularly clears maximum capacity day-ahead, and then routinely buys back that volume at a discount intraday, that points to a repeatable commercial strategy.

The real analytical step forward happens when surveillance tools bridge the gap between commercial order books and physical grid physics.

Viewed in isolation on an exchange screen, an aggressive bid often looks like standard commercial optimization. Overlay that same bid with real-time line ratings, unit availability, and network sensitivity factors, and the operational intent becomes obvious.

It boils down to a straightforward test:

Does the bidding behavior make economic sense without the expected redispatch intervention?

If a trade only turns a profit because the system operator is practically guaranteed to step in and pay for redispatch, the commercial logic falls apart. Linking physical network models with exchange data gives monitoring teams the context they need to draw that line with confidence.

Software surveillance cannot fix a flawed market design on its own. If the rules reward opportunistic bidding, capital will flow there. Modern surveillance delivers operational visibility. It gives operators and regulators clear evidence to spot strategic bidding early, document it cleanly, and intervene before isolated trades become systemic costs.

 

From transmission constraints to distribution networks

The challenge also extends beyond transmission grids.

As conventional thermal generation retires and flexible resources increasingly include batteries, demand response, electric vehicles and distributed generation, more flexibility will sit at medium- and low-voltage levels.

That creates a new coordination problem. A flexibility activation that helps a TSO resolve a transmission constraint can create a secondary problem on a distribution network if the DSO can't see or coordinate the same asset.

In Part 4 of our Grid Congestion Management Series, we examine this TSO-DSO coordination problem, including the data exchange, market processes and regulatory requirements needed to use distributed flexibility without creating new bottlenecks elsewhere in the network.